Bandipora: The Bandipora-Gurez road, which remains closed during winters due to intense snowfall, was officially thrown open for two way traffic on Wednesday.
An official said that the Bandipora-Gurez road was thrown open for two-way vehicular traffic on Wednesday by the Bandipora administration.
He said that the road opening ceremony was held at the Razdan pass- 11500 feet high wherein Deputy Commissioner Bandipora, Dr Owais Ahmad flagged off the traffic declaring officially the road open for two-way traffic.
Senior Superintendent of Police Mohammad Zahid, Chief Engineer BRO IK Jaggi, SDM Gurez and other senior officers were present on the occasion.
Gurez valley remains cut-off for around 5 months every year owing to the closure of the 85-kilometre-long road.










![{"remix_data":[],"remix_entry_point":"challenges","source_tags":[],"origin":"unknown","total_draw_time":0,"total_draw_actions":0,"layers_used":0,"brushes_used":0,"photos_added":0,"total_editor_actions":{},"tools_used":{},"is_sticker":false,"edited_since_last_sticker_save":false,"containsFTESticker":false}](https://srinagarobserver.com/wp-content/uploads/2026/10/KU-conducts-JKSET-2026-exam-350x250.jpg)





