Srinagar Observer
Wednesday, May 7, 2025
  • Home
  • Top News
  • Kashmir
  • Jammu
  • Business
  • Sports
  • National
  • World
  • Editorial
    The Habitual Shifts

    The Habitual Shifts

    Assuring Crime Free Society

    Assuring Crime Free Society

    Stimulating Young Energy

    Stimulating Young Energy

    An Ethical Denial

    Beating Inflation

    Beating Inflation

    The Timely Exigence

    The Timely Exigence

    Extension in Academics

    Extension in Academics

     Aiding Healthcare

     Aiding Healthcare

    Development in Disguise

    Development in Disguise

    Gender-Free Conviction

    Gender-Free Conviction

  • Edit-Oped
  • ePaper
No Result
View All Result
Srinagar Observer
  • Home
  • Top News
  • Kashmir
  • Jammu
  • Business
  • Sports
  • National
  • World
  • Editorial
    The Habitual Shifts

    The Habitual Shifts

    Assuring Crime Free Society

    Assuring Crime Free Society

    Stimulating Young Energy

    Stimulating Young Energy

    An Ethical Denial

    Beating Inflation

    Beating Inflation

    The Timely Exigence

    The Timely Exigence

    Extension in Academics

    Extension in Academics

     Aiding Healthcare

     Aiding Healthcare

    Development in Disguise

    Development in Disguise

    Gender-Free Conviction

    Gender-Free Conviction

  • Edit-Oped
  • ePaper
No Result
View All Result
Srinagar Observer
No Result
View All Result
Home Latest

CEO, ERA reviews progress on EOC building, 160 bedded additional block at B&J hospital

SO NEWS Desk by SO NEWS Desk
July 13, 2024
in Latest, Top News
A A
0
CEO, ERA reviews progress on EOC building, 160 bedded additional block at B&J hospital
Share on FacebookShare on TwitterWhatsApp

SRINAGAR, JULY 13 – Chief Executive Officer (CEO), Jammu and Kashmir Economic Reconstruction Agency, (ERA), Aijaz Asad, today chaired a meeting to review progress on various flagship sub projects being executed under the World Bank funded Jhelum Tawi Flood Recovery Project in the region.

While assessing work progress on the state of art EOC (Emergency Operations Centre) being constructed under JTFRP at an estimated cost of Rs 40.16 crore, the CEO was informed that most of the civil works including construction of main building, service building, dormitory building have been completed. Besides, construction of internal roads, boundary walls around the complex and installation of electrical poles has also been done while construction of fire fighting tank and other ancillary works is in progress.

RELATED POSTS

CM Omar Abdullah J&K Appreciates IGNOU’s Achievements in Kashmir

We Will Ensure Safety of Every Citizen”: LG Sinha Takes Stock of Border Situation

The CEO directed the executing agency to immediately take up the work on installation of HVAC (heating ventilation and air conditioning) system in the building and simultaneously accelerating other activities under the prestigious sub-project to ensure its timely completion.

Pertinently, the State of Art Emergency Operations Centre (EOC) building at Ompura Budgam is being constructed under the component of Strengthening of Disaster Management Capacity of JTFRP which comprises of Main Control Building with G+1 floor, Service Block, Dormitory Building for NDRF & SDRF personnel, Recreation and large sized warehouse which will be used for stocking of various relief and rescue equipments and essential food commodities.

Later, Aijaz Asad reviewed progress on construction of 160 bedded additional block at Bone and Joint, hospital, Barzulla being constructed at a cost of Rs 103.27 crore.

The CEO was informed that work on the sub-project is in advanced stage while installation of lifts, construction of connecting corridor between the old and new hospital buildings, other ancillary work on the main building is in full swing.

Aijaz Asad directed the R&B (PWD) to further expedite the pace of work on the sub project ensuring its completion within the stipulated timeline.

While briefing the CEO about the progress on construction of additional block at GDC, Bemina, the SE R&B, (PWD) informed that work on installation of lifts in the building and other minor ancillary works is being given further push to ensure earliest completion of the sub-project.

The CEO directed the engineers to meticulously monitor the progress of work on all the works being executed under the World Bank funded JTFRP to ensure that these are completed within the stipulated project deadline. He also directed for strict monitoring of quality parameters of these vital works.

Present in the meeting were Rakesh Mahajan, Director, Technical, JTFRP, Dr Altaf Kawoosa, Medical Superintendent, Bone & Joint Hospital, Barzulla, Sushil Kumar, Project Manager, JKERA, Mushtaq Ahmad, SE, R&B (PWD) Central and other senior officers of J&KERA, R&B (PWD) and Health Department.

Related

ShareTweetSend
SO NEWS Desk

SO NEWS Desk

Related Posts

CM Omar Abdullah J&K Appreciates IGNOU’s Achievements in Kashmir

CM Omar Abdullah J&K Appreciates IGNOU’s Achievements in Kashmir

by SO NEWS Desk
May 7, 2025
0

SRINAGAR, MAY 07 - The Chief Minister of the Union Territory of Jammu & Kashmir, Shri Omar Abdullah, lauded the...

We Will Ensure Safety of Every Citizen”: LG Sinha Takes Stock of Border Situation

We Will Ensure Safety of Every Citizen”: LG Sinha Takes Stock of Border Situation

by SO NEWS Desk
May 7, 2025
0

SRINAGAR, MAY 07 - In view of the escalating tensions along the borders, the Lieutenant Governor of Jammu and Kashmir,...

Heavy Damage to Public Property as Pakistan Army Resorts to Indiscriminate Shelling in Karnah

Heavy Damage to Public Property as Pakistan Army Resorts to Indiscriminate Shelling in Karnah

by SO NEWS Desk
May 7, 2025
0

Karnah Kupwara, May 07 - : In a major escalation along the Line of Control (LoC), Pakistan Army resorted to...

Speaker visits Assembly Complex Srinagar

Speaker visits Assembly Complex Srinagar

by SO NEWS Desk
May 5, 2025
0

Inspects office functioning, emphasizes smooth operations SRINAGAR, MAY 05 - Speaker Jammu and Kashmir Legislative Assembly, Abdul Rahim Rather, today...

CM Omar Abdullah urges early implementation of budget proposals

CM Omar Abdullah urges early implementation of budget proposals

by SO NEWS Desk
May 5, 2025
0

Chairs high-level meeting on functioning of offices at Civil Secretariat Srinagar SRINAGAR, MAY 05: Chief Minister Omar Abdullah today emphasized...

Next Post
DC B’la reviews preparations for Independence-Day, 2024

DC B’la reviews preparations for Independence-Day, 2024

50th Pacemaker Implementation Successfully Performed at GMC Anantnag

50th Pacemaker Implementation Successfully Performed at GMC Anantnag

Digital Edition

Srinagar Observer

Srinagar Observer is an English Newspaper based in Jammu and Kashmir

CATEGORY

  • Business
  • Edit-Oped
  • Editorial
  • Jammu
  • Kashmir
  • Latest
  • National
  • Photo Gallery
  • Sports
  • Top News
  • Uncategorized
  • World

Subscribe to Blog via Email

Enter your email address to subscribe to this blog and receive notifications of new posts by email.

Join 9,375 other subscribers

Archives

No Result
View All Result
  • Home
  • About Us
  • Contact Us
  • Advertise

© 2024 Srinagar Observer - Designed by GITS.

No Result
View All Result
  • Home
  • Top News
  • Kashmir
  • Jammu
  • Business
  • Sports
  • National
  • World
  • Editorial
  • Edit-Oped
  • ePaper

© 2024 Srinagar Observer - Designed by GITS.